-
air pre-heater
project data:4-staged pre-heater for polluted waste air.
year:2010loation:Oslo, NObranch:garbage incinerationuse:air pre-heatertube side:water / high-pressure steammaterial:carbon steeltype of tubes:bare tubeperformance (kW):4786 kW -
air pre-heater
project data:pre-heater with removable header covers powered by contaminated low pressure steam.
year:2011location:Heiligengrabe, DEbranch:wood industryuse:air pre-heatertube side:low-pressure steammaterial:carbon steeltype of tubes:E-Finperformance (kW):3512 kW -
air heater
project data:7 steam-powered heaters for process air.
year:2009location:Offenbach, DEbranch:chemical industryuse:air heatertube side:saturated steammaterial:A316Ti (1.4571)type of tube:W-Finperformance (kW):413 kW -
air pre-heater
project data:4-staged pre-heater for polluted waste air.
year:2010location:Oslo, NObranch:garbage incinerationuse:air pre-heatertube side:water / high-pressure steammaterial:carbon steeltype of tubes:bare tubeperformance (kW):4786 kW -
air heater
project data:2-staged steam-powered heater for clean air.
year:2011location:Speyer, DEbranch:chemical industryuse:air heatertube side:saturated steammaterial:A316Ti (1.4571)type of tubes:W-Finperformance (kW):243 kW -
air heater
project data:6 steam-powered heaters for process air.
year:2009location:Offenbach, DEbranch:chemical industryuse:air heatertube side:saturated steammaterial:A316Ti (1.4571)type of tubes:W-Finperformance (kW):2415 kW -
heaters for process gas
project data:1st & 2nd stage of a 4-staged heating & cooling system for process gas.
year:2012 & 2014location:Wolgograd, RUbranch:chemical industryuse:heaters for process gastube side:water / steammaterial:A304 (1.4301)type of tubes:LaserFinperformance (kW):1763 kW -
air heater
project data:starch drying.
year:2013location:Emlichheim, DEbranch:starch dryinguse:air heatertube side:watermaterial:A316Ti (1.4571)type of tubes:E-Finperformance (kW):1437 kW -
air pre-heater
project data:pre-heater for high polluted primary air.
year:2011location:Klaipeda, LTbranch:garbage incinerationuse:air pre-heatertube side:superheated hp-steammaterial:carbon steeltype of tubes:bare tubeperformance (kW):5116 kW -
air pre-heater
project data:pre-heater for clean secondary air.
year:2011location:Klaipeda, LTbranch:garbage incinerationuse:air pre-heatertube side:saturated steammaterial:carbon steeltype of tubes:E-Finperformance (kW):2985 kW
Air Heaters and Air Pre-Heaters
WE DESIGN YOUR HEAT EXCHANGERS/AIR-COOLED PLANTS AND SYSTEMS
As a reliable and quality-oriented partner, we help you stay on top of the constant challenges in the development of heat transfer systems.
We are also happy to discuss with you your projects, ideas and individual needs in the area of heat transfer.